Skip to main content
Work With Us

Knowledge Base

Resources & Guides

Practical guides, checklists, and reference documents for developers, GCs, facility managers, and property owners working on commercial projects in Central Florida.

How to get a guide: Click "Request This Guide" — we'll send it to your email. All guides are free.

Downloadable Guides

Civil Site Development

Central Florida Site Development Permit Checklist

Every permit typically required for commercial site development in Lake, Sumter, Marion, Citrus, and Hernando counties.

Covers:

  • County Land Disturbance / Site Development Permit
  • ERP from SJRWMD or SWFWMD
  • NPDES Notice of Intent (sites > 1 acre)
  • FDOT Driveway Connection Permit
  • Army Corps Section 404 (wetland impacts)
  • FDEP NPDES Industrial Stormwater
Irrigation Management

Florida Irrigation Water Restrictions Guide

County-by-county irrigation schedules for Central Florida, seasonal adjustment requirements, and Florida-Friendly Landscaping compliance notes.

Covers:

  • Lake, Sumter, Marion, Citrus, Hernando schedules
  • SJRWMD vs SWFWMD district boundary
  • ET-based controller programming guidance
  • Fertilizer blackout season calendar
  • Florida Statutes Chapter 373 references
  • Landscape establishment variance process
Lawn Maintenance

Commercial Landscape Maintenance Spec Template

A ready-to-use specification template for property owners and GCs to get apples-to-apples bids and enforce service standards.

Covers:

  • Mowing frequency and height by turf type
  • Edging, trimming, and blowing standards
  • Fertilization (Florida BMP-compliant)
  • Pest and disease scouting requirements
  • Irrigation inspection protocols
  • Service documentation requirements
Permitting

Florida ERP Stormwater Permit Overview

Plain-language summary of the ERP process — who needs one, what triggers review, which district has jurisdiction, and typical timeline.

Covers:

  • ERP permit thresholds (acreage, wetlands)
  • SJRWMD vs SWFWMD jurisdiction map
  • General Permit vs Individual ERP
  • SB 7040 (2024) stormwater rule update
  • Typical ERP timeline and fee schedule
  • What EUI handles vs. the engineer
Project Preparation

Pre-Construction Site Preparation Checklist

Everything a developer, GC, or owner should verify before their site contractor mobilizes — permits, utilities, survey, and access.

Covers:

  • Final permit set confirmed (county, ERP, NPDES)
  • Sunshine 811 locate ticket submitted
  • Survey control established
  • Access easements and gate codes confirmed
  • Adjacent property notifications
  • Construction entrance designated
Landscape Installation

Florida-Friendly Plant Guide for Commercial Properties

Curated Florida-Friendly Landscaping™ plants for commercial properties — organized by water use category and application.

Covers:

  • Low-water-use trees for commercial streetscape
  • Florida-native palms at commercial scale
  • Drought-tolerant groundcovers for large beds
  • Salt-tolerant selections for road-adjacent sites
  • Invasive species banned in Florida
  • UF/IFAS compliance notes

Featured Podcast

The Block Podcast

Real conversations about commercial landscaping, site development, and outdoor property management in Central Florida — for owners, GCs, and developers who want straight answers from the field.

Have a Question Not Covered Here?

Our team is available to discuss permitting questions, scope planning, or anything specific to your project in Central Florida.

Ready to Discuss Your Project?

One Call. All Three Divisions.

From initial clearing through final landscape and long-term maintenance — Earthscapes Unlimited coordinates your entire project under one contract, one schedule, one team.